Tips
Practical advice distilled from real Australian homebuilder experiences.
525 tips published
Showing all 525 tips
Page 1 of 35
- Room Planning & OrientationNew home floor plan review and suggestions
Incorporate a door height opening (DHO) at the end of the hallway before the living room.
- Room Planning & OrientationNew home floor plan review and suggestions
Consider a U-shaped kitchen layout if an island bench is not feasible.
- Construction & Site WorksRemoving internal wall during construction
Ask your builder for a written quote detailing all costs and potential delays before agreeing to any internal wall removal during construction.
- Construction & Site WorksRemoving internal wall during construction
Confirm if the internal wall is load-bearing before requesting its removal, as this significantly impacts feasibility and cost.
- Surveys & PermitsRemoving internal wall during construction
Inquire about the need for building permit resubmission and engineering certification if an internal wall is to be removed.
- Surveys & PermitsRemoval of floor wastes from wet areas in new builds
Confirm with your local council whether floor wastes are mandatory in wet areas for your new build.
- Prestart & ElectricalsRemoval of floor wastes from wet areas in new builds
Request tile insert floor wastes if aesthetics are a concern and they are still required.
- Building ContractsRemoval of floor wastes from wet areas in new builds
Obtain written confirmation from your builder regarding warranty implications before removing floor wastes.
- Handover & DefectsRemoval of floor wastes from wet areas in new builds
Consider the potential for water damage and insurance implications when deciding to omit floor wastes.
- Construction & Site WorksVolume builder construction timeline and quality concerns
Request a building inspection during construction, even if your builder claims fast builds are of high quality.
- Builder SelectionVolume builder construction timeline and quality concerns
Verify a builder's registration number and check their history, especially if they appear to be a new entity or have limited online presence.
- Handover & DefectsVolume builder construction timeline and quality concerns
Confirm if the builder completed the driveway and exposed aggregate before handover.
- Prestart & ElectricalsExterior colour selection for new build
Keep roof, gutters, bargeboard, and garage doors the same colour for a seamless top-line appearance.
- Prestart & ElectricalsExterior colour selection for new build
Consider the potential for fading on darker exterior colours if the front of the house faces north or west.
- Construction & Site WorksRubbish dumping by neighbouring builders onto a new home site
Photograph any rubbish dumped on your site, noting the neighbouring builder's signage if visible.